- Chenab
- Jhelum
- Ravi
- None of these
- b
-
The height of this Dam is 147 meters.
Its construction was started in 1961 and completed in 1965.
Its installed capacity is 1150 to 1500 MW.
The height of this Dam is 147 meters.
Its construction was started in 1961 and completed in 1965.
Its installed capacity is 1150 to 1500 MW.